|
时间因素对国际承包工程的影响 |
Influence of time factors on international contracted works |
|
DOI: |
中文关键词: 国际工程承包 FIDIC 合同条件 招标与投标 索赔 |
英文关键词: International works contract FIDIC condictions biding,claims |
基金项目: |
|
摘要点击次数: 4077 |
全文下载次数: 3701 |
中文摘要: |
根据“土木工程施工合同条件”(FIDIC 合同条件)和国际惯例对承包商的时间性的约束条款,分析了时间因素对国际工程承包活动中投标报价与谈判、工程施工、工程保修三个阶段的影响,并提出一些相应的应对措施。 |
英文摘要: |
In the light of constraint time clauses of Condictions of contract for works of civil engineering construction (Federation Internationsale des Ingerieurs conseiles(FIDIC))and intennational convertions on contractor,the thesis analyses the influence of time factors on three periods of biding and negeotiations,constructions and maintenance in international contracted works.It also proposes some relevant measures about it. |
查看全文
查看/发表评论 下载PDF阅读器 |
关闭 |