|
高温煅烧石膏硅酸盐水泥早期水化产物的研究 |
Investigation on the Effect of Calcined-gypsum on the Early Hydration of Portland Cement |
|
DOI:10.3969/j.issn.1671-5322.2001.01.001 |
中文关键词: 石膏 煅烧石膏 AFt 增强机理 |
英文关键词: gypsum calcined-gypsum ettringite retartding mechanism |
基金项目:江苏省教育厅自然科学基金 |
|
摘要点击次数: 4839 |
全文下载次数: 3766 |
中文摘要: |
利用DTA、XRD、IR、化学结合水和Ca(OH)2生成量测定等方法,研究了煅烧石膏、二水石膏对硅酸盐水泥早期水化过程的影响.结果表明:在水化龄期相同时,掺煅烧石膏水泥浆体中水化产物同掺二水石膏相比,Ca(OH)2生成量大;在一天前无AFt生成;结合水量在一天前前者高于后者,而一天后则相反.指出了煅烧石膏提高水泥强度的机理在于:由于煅烧石膏的溶解速度较低,在水泥水化初期(1 d前),存在于水泥中的铝酸盐相不能形成AFt,从而减缓了AFt对水泥水化的延缓作用,加速了整个熟料矿物相的水化,提高了水泥的强度. |
英文摘要: |
By experiment methods of DTA,XRD,IR,Chemical combined water analysis,Ca(OH)2 content and so forth,the effect of gypsum and calcined-gpysum on the early hydration of Portland Cement was investigated. The result showed that the hydrat product of the cement added calcined-gypsum has more Ca(OH)2 content during whole hydrating stage,less chemical combined water before 1 day and more after 1 day,and ettingite can not formed before 1 day comparaed with adding gypsum,.The reserch indicated that adding calcined-gypsum instead gypsum to cement can reinforce the early strength of cement, because the aluminate phase present in clinker can not hydrat to form ettringite during 1 day due to low dissolution rate of calcined-gypsum, so retarding action of ettingite on clinker hydration is decresed, the whole clinker mineral hydration is accelerated, the paste strength is incresed. |
查看全文
查看/发表评论 下载PDF阅读器 |
关闭 |
|
|
|