文章摘要
新安江水电站坝体补强灌浆设计与施工
Design and Construction of Grouting Reinforcement to the Dam Body of Xinan Jiang Hydropower Station
  
DOI:10.3969/j.issn.1671-5322.2007.01.019
中文关键词: 坝体  补强灌浆  新安江水电站
英文关键词: dam body  grouting and reinforcement  Xinan Jiang Hydropower Station
基金项目:
作者单位
吴晓鹏 河海大学地质及岩土工程系江苏南京210098 
张勤 河海大学地质及岩土工程系江苏南京210098 
摘要点击次数: 3829
全文下载次数: 3361
中文摘要:
      采用灌浆法处理病险坝体工期短、投资少、效果明显.首先介绍了新安江水电站坝体补强灌浆问题的提出及设计依据;其次,阐明了坝体补强灌浆的施工工艺,并对灌浆资料进行统计分析;最后,通过检查孔的相关参数对灌浆效果进行综合评价.
英文摘要:
      Grouting is widely used in handling to dangerous dam bodies with the advantages as follows: short construction period,investment-saving and good effect.The article begins with an brief introduction to the design of grouting reinforcement to the dam body for Xinan Jiang hydropower station.Then,it illustrates the construction technique for dam body grouting and reinforcement and analyses the data of grouting.Finally,the article processes the comprehensive valuation of grouting effects through relevant parameters of checking holes.
查看全文   查看/发表评论  下载PDF阅读器
关闭